DetailsUnique project, due to the planting of palm trees at the GPS point (calpinage constraint, planting before paving). Numerous landscaping masonries: working with a stonemason to create irregular, numbered stonework, in addition to concentric stonework in an irregular format; creation of a stone coping cut from the mass. Ironwork including the creation of metal cocoons. Creation of a tufa channel, with its inlaid LED strip; installation of a fountain with a water feature.Share